
Effort Reporting System (ERS) Department Coordinator Guide [Note that a separate guide is provided for Committed Effort Management (CEM)] Log on:
(a) Changing Sub DC or Updating Sub DC rights (for Sub Department only): 1. Select the option to “Change Sub DC/Update Sub DC rights”. Click the “
(2) Notification 1. Click the “Notification” option on the left side menu bar. 2. There are a series of predefined email sets. You may choose one
Getting Familiar with the Form: 1. Clicking on a link in the payroll column will display the detail for each pay period for the account. Clicking
6. If a cost transfer was entered in HRIS, the user must wait for the transfer to be processed before proceeding. Note that journal entries are pro
(5) Post Review Post Review All vs. Post Review: The Post Review option links to the effort forms of only those employees for whom you are assigned
(6) Reporting 1. Click the “Reporting” menu option. 2. Select a report using the link provided for the report. 3. Select the period to which the
Comments to this Manuals